PLC 1041 - Single Phase Construction
Clock Hours: 168
Delivery Mode on-ground
Course Description: This course covers how to install guys to support a utility pole, as well as how to install the equipment on the pole to support conductors. It includes the installation of cross-arms, transformers, and conductors.
Student Learning Outcomes:
- Describe single-phase construction.
- Identify the hardware used in aerial framing.
- Using the standard manual, identify materials, assorted pole hardware, and support arms needed to perform aerial framing on a single-phase pole.
- Describe, assemble, and install guys.
- Perform an aerial framing procedure as defined by the instructor.
- Hand-pull single-phase primary conductors, dead end, and sag.
- Explain how to install a transformer and connect conductors.
|
|