|
Mar 10, 2025
|
|
|
|
EAP 2050 - Wiring & Protection I
Clock Hours: 9
Delivery Mode on-ground
Prerequisites: All First Term Courses
Course Description: Review service equipment grounding and bonding; NEC Article 240.4 and Part II of Article 250; separately derived systems; sizing and permitted resistance of grounding electrodes; installation of grounding electrode conductors; and types of EGCs.
Student Learning Outcomes: Upon completion of this course, the learner will:
- Understand, in detail, the definitions in Article 250; the general requirements of 240.4; and the systems required to be grounded as mentioned in Part II of Article 250
- Understand and apply the requirements for service equipment grounding and bonding
- Understand how to recognize separately derived systems
- Comprehend permitted resistance of grounding electrodes and recognize different types of grounding electrodes
- Properly size the grounding electrode conductor and recognize conductors permitted to be used as grounding electrode conductors
- Be able to properly size install grounding electrode conductors
- Recognize equipment which isn’t a part of the electrical system that needs to be bonded and grounded
- Understand the reason for equipment grounding and bonding
- Be able to recognize types of ECGs, apply identification methods of EGCs, and determine the proper size of EGCs.
|
|