ESP 1082 - Integrated Projects I
Clock Hours: 24
Industry Certifications The Integrated Projects course provides the student an opportunity to develop the discipline and essential self-directive skills required in the technical profession they have chosen. The course time provided in Integrated Projects will be utilized by the student, with the instructor’s assistance, to develop a plan and course of action to accomplish a defined task. These individual (lesson) plans will be developed using a standardized logical format, allowing the student to take ownership and responsibly in the process and outcome. The Integrated Projects course may be used in multiple ways. For example this time may be used to develop a plan to complete normal coursework; it may be used to participate in an advanced class project; it may be used to perform live repair/trouble shooting work, or it may be used to move forward in required program coursework, allowing an individual to finish ahead of schedule. In all cases instructor involvement and approval is required.
Course Description: Instructor approval must be obtained to charge time to this course
All Integrated Projects require the following thought and documentation.
You may refer to this as: THE PROCESS
BIG PICTURE
- “Think” about the major task to be performed.
- List the task
- Prioritize the task
TURN BIG PICTURE INTO SMALLER PICTURE
- Break down each task into smaller steps.
- Work through each task in your mind and then on paper
- Identify safety issues
- Man power required
- Time required (develop a schedule)
- Tools
- Materials
|